Last year Culver started a new initiative to replicate the positive steps taken by Marshall County Crossroads with a local version, Culver Crossroads. I have agreed to be involved in several capacities, serving on the Steering Committee & Business Development Committee. There’s the possibility that there will also be a Housing Committee that I would serve on as well. Housing has initially been put under Quality of Life. I’m not sure if that’s going to work or not. I agree the goals are similar, but housing may take some specific focus. In any case, another year, another committee! Lets see if we can make things better.
Culver
Trash Surrounds

A few years ago we posted pictures of this pool surround fence we saw in Wabash, IN. We liked it and decided to rework it as dumpster surrounds at Sand Hill Farm. Plagiarism is the sincerest form of flattery, you know… We have used this for the dumpster surround for Sand Hill Farm Apartments and then again at The Paddocks.
The original stained cedar would have been a little bit of overkill and a little too much to maintain for dumpster surrounds, so we reworked the basic design to frame it with treated lumber. We maintained the galvanized corrugated metal panels for the main screen.
In the original, as a pool surround, more care was needed for details to assure no sharp edges were exposed to the bare skin you would find around a pool. Trash dumpsters are a little more forgiving and we were mostly interested in the exterior look. We also knew that maintenance would be an issue, so we looked at reducing areas to collect debris and ways of making it easier to clean, like providing space beneath the panels.
Depending on how the wood weathers, we may or may not go back and stain the treated lumber next year. For now, it is a clean look and creates a more pleasing screen than the chain link and vinyl ribbon you see so often. The green of the treated lumber actually goes with the greens used on the buildings and the overall farm theme.
New Comp Plan for Culver
For the last couple of years, I’ve been trying to get Culver to consider a Comprehensive Plan update. There are a few reasons for this:
- It’s just good practice. Most of the time it is recommended that a town’s comprehensive plan is reviewed and updated every five years with a new one completed every ten to fifteen years. Culver’s current comp plan was completed in 2014. I really thought we should have done this in 2020 since we could have called it Culver’s 20/20 vision, but last year was, um, challenging, to say the least. I bet there would have been good Zoom participation just out of boredom though!
- Stellar… The two Stellar Strategic Action Plans that brought us Stellar designation used the 2014 comp plan as a jumping off point. (As they should have.) For that reason, most of the readily achievable goals and even a few aspirational goals have been met or at least advanced. No sense sitting our our laurels. What are the next things we need to achieve?
- Future grants will require an updated comprehensive plan. The Stellar program required a comp plan no more than five years old. Other grant opportunities may hinge on that as well. If that’s the case, a comp plan can’t be updated overnight.
- Our community has changed physically. We’ve added the housing at Sand Hill Farm. There are 72 new residences there since the last comp plan and many of those are new faces in Culver. The Maple Ridge housing was not here in 2014. More than a few infill lots have seen homes constructed, while we have lost the trailer park, the City Tavern building, the Evil Czech building and the Boetsma property has been partially destroyed by fire. We have annexed new property on the northwest side of town. We have accepted the East Shore Sewer Corporation into Culver’s wastewater system.
- Our Community leadership has changed. Ginny Munroe has stepped down from the Town Council. Her leadership in spearheading the Stellar effort was invaluable. Tammy Shaffer stepped out of town leadership after being an important part of the Town Council and Redevelopment Commission. Pete Peterson, a long time Plan Commission stalwart has retired and sadly, some community leaders like Ralph Winters have passed away… New people have stepped up to replace them and their voices need to be represented in a new comp plan.
- Building Commissioner Chuck DeWitt has asked the Plan Commission to start a monthly review of the Comprehensive Plan in advance of an update or new plan. The Plan Commission will take up a couple of chapters a month. As always, the Plan Commission and Board of Zoning Appeals are seeing new challenges to the Zoning Ordinance, which is based on the goals and aspirations of the Comprehensive Plan. We have new types of development occurring, such as the RV storage facilities planned at the end of Main Street, which will involve another annexation. These things need to be addressed in the comp plan.
Some things on my agenda?
- I was disappointed that Culver didn’t work harder to obtain our allowed 2 mile extraterritorial boundary. We were already sorely below the allowable area, but since the last comp plan, we have annexed land to the north and west and we’re about to annex land to the south. There has been no expansion of our extraterritorial boundary with this growth.
- Since I served on the previous Comprehensive Plan Committee, I have become more in tune to housing and housing needs. The video below is an example of how we could adjust our zoning requirements to allow new and different affordable housing. Should we be a bit more progressive, consider new urbanism and other non-traditional zoning options?
- Little was done to advance zoning changes to reflect the land use planning included in the last comp plan. We need to be more proactive.
- More education is needed on the use of the comp plan. (Part of this is due to the change over talked about above, so there are new people involved.) The Plan Commission has done better with it’s referencing of the comp plan, but it is still not regularly referred to by the Town Council when decisions are being made regarding infrastructure. It is still too common to see projects that address today’s needs without addressing future potential. The sewer lines at Sand Hill Farm were not extended nor at the correct depth for future growth in the area. Can we do better with the annexation and infrastructure extensions we’re getting ready to do to the south? When the (now defunct) PUD was created for housing on the west side, the comp plan’s goal of extending Academy Road to S.R. 17 was ignored. (The developer should have been required to plan for it on his property and Culver could have worked on the remaining pieces needed as development progressed in the future.)
I was pleased to hear that the Plan Commission is starting the discussion. A revised comp plan will lead to a zoning ordinance update, a new strategic plan and hopefully a new list of accomplishments for Culver to start working on. Jim Dicke once told me, “Towns are growing or dying. There is no way to remain the same.” Culver is on a growth trajectory. We need to keep that going!
Big Splash
This past Saturday saw the individual ribbon cuttings for the combined Marshall County Philanthropy Center and the Dr. Susan Bardwell Aquatic Center project. The picture above is from The Pilot News documenting the speeches that were given before the ribbon cutting at the Philanthropy Center.

I represented Culver on the Marshall County Economic Development (MCEDC) Board and the Marshall County Community Foundation (MCCF) Board when these projects started. I helped more on the development side while at MCEDC and then helped MCCF with architectural plan reviews, construction site visits and oversight advice. I sometimes give public boards and commissions grief about not making the best use of community knowledge. Sharing expertise is the most valuable form of volunteering. MCCF took full advantage of what I could offer and I was glad to share it. A win-win all around! It’s always better to get involved than to just complain.
Elkay Visits Sand Hill Farm Apartments

Earl Lilly, Plant Manager of Elkay Wood Products in Culver, brought a large contingency of Elkay employees to observe the cabinets going in at Sand Hill Farm Apartments this past Tuesday. Representatives of several divisions that worked on these cabinets were there including engineering, scheduling, production & shipping. They often don’t get to see their products in place, so this was a great opportunity to see a large installation underway just a block from the plant. Steve Deford of Deford Kitchens, the cabinetry installer for the project, was onsite to discuss how the installation was going. The installation is going well!
It was great to see some of the people that work in our community and could potentially be future residents at Sand Hill Farm Apartments at the site. The optics of the private/public partnership that occurred here was instrumental in Culver’s success in the Stellar Communities program. Elkay Wood Products and Easterday Construction Co., Inc. helped developer Culver Sand Hill Farm, LLC step up to the challenge of creating affordable housing for the Town.
Shelby Harrell, editor of the Culver Citizen, was on site to document the event. Her article appeared in The Pilot News on October 18, 2018. (See the article to the right.) The exposure can only help the project’s success. We count this as part of the community effort to see more entry-level housing in Culver. Thanks Shelby!
Unfortunately progress is currently impeded by the late start on the street. Lack of utilities is slowing us down and may force a stop soon. Currently we’re moving 5 gallon buckets of water to the site from our office in order to keep working. NIPSCO could not bring gas and electric to the building without the completion of street utilities. The furnaces are ready but can’t be fired without gas and electric, so we’ve started providing temporary heat with space heaters in order to keep things warm enough for the various sealants, adhesives and paint needed to finish out the project. The fire sprinkler system is full of water and in danger of freezing with the cold nights we’ve been having.

The lack of fire protection is also a concern, since the sprinkler system has water in it within the building, but does not have a hook up to the Town water system yet. The fire hydrants that serve the building currently have no connections. We’ve been assured these things will be available soon.

