Sand Hill Farm Drone Pictures

Aerial from Southwest

Les McFarland, Bourbon Town Council President, did us a solid Sunday, July 15th, and used his drone to take these (and a bunch of others) aerial pictures of Sand Hill Farm Apartments under construction. These are being used in the IHCDA application for the second phase – The Paddocks at Sand Hill Farm. This will be additional entry level housing. The application is supported by Culver’s Stellar Designation. It goes in July 30th and we’ll find out if we were successful in November.

Aerial from the Northwest

This is the kind of collaboration and connections that have been achieved due to Marshall County Economic Development Corp.’s (MCEDC) County Development for the Future meetings that brought Marshall County and all of our community leaders together to meet and discuss common goals. I would not have known Les to ask for his help without this connection. Les may or may not have helped Culver in the past before we met and shared our common goals. Now we’re embarking on Marshall County Crossroads – an effort to duplicate Culver’s Stellar success under the new Regional Stellar program. We should have an advantage as we have been collaborating between our communities for over five years.

Thanks Les! Your help is sincerely appreciated.

 

Suburban Sprawl in Culver?

Wikipedia defines Suburban Sprawl thus: “Urban sprawl or suburban sprawl describes the expansion of human populations away from central urban areas into low-density, monofunctional and usually car-dependent communities, in a process called suburbanization.” While Culver isn’t exactly racing down the road to strip malls, it’s worth looking at the changes occuring in recent and proposed developments in Culver.

Culver’s early development was very traditional. Despite dealing with the curvature of Lake Maxinkuckee, a traditional grid system was used for both the commercial and residential areas with the section of Lake Shore Drive along the Park being one of the few deviations with some curvature to reflect the lake shore. Since that time, the newer subdivisions have not followed the grid. The Riggings, Maple Ridge and Edgewood Estates are all dead end or loop streets with no plans to tie into the grid. It’s a little cheesy, but Adam Conover of “Adam Explains Everything” does a quick run down of some of the issues here:

Read more

Damore Amphitheater – Preconstruction Meeting

We had the preconstruction meeting for the Damore Amphitheater this morning. We had all the staking completed and the tiers painted on the grass… but the paint didn’t show up too well through the snow! (See Right) Happy April!!! Not exactly the way we wanted to start the project…

The timelike on this calls for completion by Memorial Day. Despite the snow fall Mother Nature so rudely dropped on us today, we should still be good to go for that. There may be some plantings that stretch that date if the nurseries can’t open, but it’s too soon to be pessimistic about that. We have most of our orders placed and should be good to go with all of the hardscape.

Conceptual Drawing

FH Decks and Landscaping, Inc. will be our major subcontractor on this project, completing the earthwork, stone work and landscape installation. We wanted to keep this project local and were happy that it turned out that way.

This project was part of Culver’s Stellar Communities application in 2016, but through fundraising and other grants, Culver was able to move forward on this project without Stellar. This was done through IHCDA’s Patronicity program. That made room for other project funding in the 2017 Stellar application. Thanks go to the Damore family stepping up as the lead sponsor. Their leadership was invaluable.

Sand Hill Farm in the News

Article from the March 30, 2018 Culver Citizen

We made the paper this week with our Sand Hill Farm Apartment’s project appearing in the Culver Citizen. Beth Pare and her son came out in the rain for a walk-thru this past Tuesday. Despite the rain there was still a lot of activity at the site. Drywall was being delivered as we spoke.

There’s not much doubt that the follow-thru on our Stellar 2016 application pledge of completing workforce housing helped us secure Stellar Community designation in 2017. Preliminary site work had already begun when the Stellar Site Visit occurred. Our successful Stellar designation makes this phase I of workforce housing. Our application for IHCDA funding goes in this July. We will be starting with a market study shortly and will plan for that construction in 2019.

Progress has been good this week. All but four windows are in place. Those four have been left out on the second floor until the rest of the drywall is delivered. The drywall will be place on the second floor through those openings using a boom truck. The majority of the exterior doors have been installed. The shingles are on. The interior winding stairs to the second floor bedrooms have been installed. And progress continues on Plumbing and Electrical rough-in.

Last week we had meetings with Elkay to discuss the cabinetry that they are providing. They made an additional change to include Elkay sinks in each unit. Thank you Elkay!

Sand Hill Farm 3D

The First 3 wall panels installed February 16, 2018

As we all know, this winter has been challenging to say the least. Four 50+ degree swings so far this year. Despite that we’ve muddled along and made some progress at the Sand Hill Farm site. Most of the work has been underground, but as of last Friday, wall panels have begun to stand up on the building pad. We;re now in 3D! The erection crew worked over the weekend and about half the first floor is framed. At this rate they will make quick work of things and we’ll be weathered in before we know it.

In the picture you can see that the first three panels at the Southwest corner are in place. The panels are 2×6 framing with OSB exterior sheathing. The 2×6 framing allows for additional insulation. The 2×6 studs are on 24″ centers to reduce the areas of heat transfer for energy efficiency. California Corners (Green That Saves Green 101) were used to increase insulation as well. The window and door openings are pre-framed, so once the panels are up and the house wrap is installed, the fenestrations (our big word of the day) will be filled quickly too.

Fire Hydrant at the Southwest corner of the Building

Note the fire hydrant in the lower right of the picture. The main water lines are in place as well. We have a fire hydrant waiting on the Town to bring water to it. My understanding is that the street and utilities project should go out for bid within 2 weeks with bids due in around 6 weeks. We’ll be needing that soon! They’ve promised installation by the 1st of June.

The building will be sprinkled, so we already have the riser in place in the maintenance room for fire protection. Rough-in for that will begin once framing is complete so we can get things placed prior to drywall installation.

It’s great to see things coming together after some of the earlier struggles.