We lost another long time member of the Easterday Construction family last week. Dave Osborn was a carpenter at Easterday Construction for decades. As a Merit Shop company, we ask our employees to have many skills and Dave was no exception. Along with Carpentry, he helped as a Cement Mason, Steel Erector, Welder and occasional Mechanic. Dave was a hard worker and never turned down a request.
You could count on Dave to be there giving it his all when there was a concrete pour, sweating through his sleeveless T-shirt and wringing sweat out of his red, white & blue sweat band as he jeered younger workers because, “You can’t keep up with this old man???” Well, except when there was no one around but the crew, that would be enhanced with a string of choice expletives! He was always careful to be sure no one outside the crew around before he cut loose. He was always a gentleman around women and our clients. For example, after building a custom home for the Falender family, Steve Falender wrote us a very nice letter. This is a paragraph excerpt that specifically referenced Dave:
“During framing, I decided the wall between the living room and the kitchen, as built and designed, was 5 inches too long. I asked Dave how difficult it would be to move it. His response was: ‘We’re here to do whatever you want.’ I can’t remember a single time when any of your employees or subs complained about a change.”
Dave was a farmer even while working full time in construction. As a typical farmer, he never had a good year and there was always too much rain or not nearly enough. He maintained a vegetable garden as well and was always bringing in vegetables to share with his fellow workers. Even after his retirement, he would stop by to share his bounty. We could always count on sweet corn, tomatoes or squash at least once during the summer season.
All of us at Easterday Construction have fond memories of Dave. He will be sorely missed.
Happy New Year from everyone at Easterday Construction Co., Inc.! As with most years, 2018 was full of wins & losses, successes & frustrations, progress and stagnation.
Our biggest project of 2018 was Sand Hill Farm apartments. Starting out as a bright spot in our participation in Culver’s Stellar program, it has been plagued by delays, affected by internal and external forces. Despite that, I’m pleased with the way it is shaping up and I’m proud that we can take this step towards relieving Culver’s housing crunch and at the same time bring new families to the community. All in all, we should be able to point to it as a success when this 24 unit apartment building opens in early 2019.
We also completed work on the Damore Amphitheater at the Culver Town Park. This was a project originally on the Town of Culver’s 2017 Stellar application that they were able to accelerate with the help of Patronicity. This project was completed in late Spring.
2019 also saw several projects at the Culver Community Schools. We completed a new entrance and vestibule moving the main entrance for the Middle and High School to the west side of the media center which will now serve as the new offices. This moves the offices to a more central location in the school. A second project saw renovations to the main restrooms, updating and modernizing them. The institutional block wall finish that served the rooms since the 60’s were updated with a decorative tile wainscot, with drywall above that. New toilet fixtures, toilet partitions, lights and acoustical ceiling tile all helped bring a modern look to the facilities.
A milestone event this year was accepting the State of Indiana’s Half Century Award. As near as we can determine, Easterday Construction is actually around 90 years old, but who knows if the award will still be given 10 years from now? Better to accept the half century now. I can tell you that Governor Holcomb and IEDC did a nice job with the event, making all of the attendees feel suitably honored. I want to thank my niece Nikole again for being my escort and personal photographer.
So it looks like I’ve been mainly positive here, so it’s probably a good time to close this before I find something negative. All and all it’s been a good year. I hope it has been the same for all of our friends and clients. Once again, best wishes for a Happy, Healthy, Prosperous New Year!
Easterday Construction Co., Inc. participated in the ABC (Associated Builders and Contractors) STEP (Safety Training and Evaluation Process) program again this year and achieved Silver Level status. Thanks to all our employees that made this possible.
Earl Lilly, Plant Manager of Elkay Wood Products in Culver, brought a large contingency of Elkay employees to observe the cabinets going in at Sand Hill Farm Apartments this past Tuesday. Representatives of several divisions that worked on these cabinets were there including engineering, scheduling, production & shipping. They often don’t get to see their products in place, so this was a great opportunity to see a large installation underway just a block from the plant. Steve Deford of Deford Kitchens, the cabinetry installer for the project, was onsite to discuss how the installation was going. The installation is going well!
It was great to see some of the people that work in our community and could potentially be future residents at Sand Hill Farm Apartments at the site. The optics of the private/public partnership that occurred here was instrumental in Culver’s success in the Stellar Communities program. Elkay Wood Products and Easterday Construction Co., Inc. helped developer Culver Sand Hill Farm, LLC step up to the challenge of creating affordable housing for the Town.
Shelby Harrell, editor of the Culver Citizen, was on site to document the event. Her article appeared in The Pilot News on October 18, 2018. (See the article to the right.) The exposure can only help the project’s success. We count this as part of the community effort to see more entry-level housing in Culver. Thanks Shelby!
Unfortunately progress is currently impeded by the late start on the street. Lack of utilities is slowing us down and may force a stop soon. Currently we’re moving 5 gallon buckets of water to the site from our office in order to keep working. NIPSCO could not bring gas and electric to the building without the completion of street utilities. The furnaces are ready but can’t be fired without gas and electric, so we’ve started providing temporary heat with space heaters in order to keep things warm enough for the various sealants, adhesives and paint needed to finish out the project. The fire sprinkler system is full of water and in danger of freezing with the cold nights we’ve been having.
The lack of fire protection is also a concern, since the sprinkler system has water in it within the building, but does not have a hook up to the Town water system yet. The fire hydrants that serve the building currently have no connections. We’ve been assured these things will be available soon.
During the construction of the new vestibule entrance at the Culver Community Middle High School, we were asked to duplicate the existing office in the former Media Room for a new Principal’s Office. This was a change order to the original project, but the goal was to keep it on a similar time line. The old office, shown to the right, was constructed using a block lower wall with hollow metal window frames in the upper area. The wire glass windows in the existing office are mostly obsolete technology at this time. Appropriate for the long term and reasonable to do during new construction in 1991, this proved to be an expensive add-on with long lead times and multiple trades involved.
We worked with the School to provide a better solution. The new Principal’s Office, shown to the left, has been constructed with a wood stud and drywall lower wall, dark bronze store front aluminum framing and an aluminum & glass door. It mimics the layout of the old office, but gives a more modern look. As a bonus, it was something that could be constructed quicker and at a savings of thousands of dollars. The office as pictured is nearly complete, lacking only the installation of a few of the window panes to wrap it up. We were pleased we could help with this solution.