The Paddocks Apartments Update April 3rd, 2020

Block accents in place on Apt 100

A lot has gone on at The Paddocks apartments in Culver since our last post here. Things have been busy in the field so that’s cut into writing time. The latest thing to get underway is some of the masonry. All of the buildings have masonry accents. For the apartments, those accents are split face block on the sides between the balconies/patios. The picture above shows progress on the masonry accents on the first (west – Apt bld 100) apartment building.

Townhome Building 505 has just had rough-in inspections.

The first townhome building on the south side of Cavalier Drive is up and weathered in with shingles on the roof and windows & doors in place. It had inspections on plumbing, electrical and HVAC ductwork rough-ins completed yesterday by the Marshall County Building Inspector. These buildings will be well inspected since we not only have the local inspector looking at them, but they are being visited by an inspector from IHCDA (Indiana Housing and Community Development Authority) and from an engineering firm working for the lender. We are also going for NGBS (National Green Building Standard) Silver status which means there will be another inspector coming out to inspect the HVAC system and the building envelope to meet those standards.

Apt Blds 100 & 200 are weathered in

The first two apartment buildings (100 & 200) are up and weathered in with shingles on the roof and windows & doors in place. Most of the HVAC system rough-in is done in both of these buildings. Plumbing rough-in is nearly complete in the building 100 and underway in building 200. Electrical rough-in is underway in building 100. The balcony decks are in place on both buildings. We have ordered the stairs and railings. They will be aluminum in a similar style to what was used at Sand Hill Farm apartments. The masonry accents are now in place on building 100 and are underway on building 200.

Apt Bld 300 has second floor framing underway

The last apartment building (300) has the foundation and slab in place and framing is currently underway. Roof trusses were delivered today. It should be weathered in within a few weeks, weather permitting

Along with the building construction a lot of the site work is in place. The drive for the first townhome building has the base stone in place. The pad for the next townhome building is prep’d and ready for footing excavation. The sites for the last two buildings, another townhome and a community building, are close to grade now. The site water, sewer and storm infrastructure are complete in some areas. We’ll be preparing the main parking lot for its stone base soon.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Copyright 2011 - Easterday Construction Company, Inc. - All rights reserved.
top