I just returned from Wabash where I made a presentation to obtain a “Certificate of Appropriateness“. This was required before I could obtain a Demolition Permit necessary to remove a deteriorating old building. I was required to submit floor plans, elevations and a perspective rendering of the proposed new construction. How ironic that on the way back to the office I listened to a NPR piece on Houston, Texas where they don’t even have Zoning!